Eagle Disposal, Inc.
junk-removal
Serving Franksville, WI
From Google Business Profile
3.4
99 Google reviews
Hours
| Monday | 6 AM–4 PM |
| Tuesday | 6 AM–4 PM |
| Wednesday | 6 AM–4 PM |
| Thursday | 6 AM–4 PM |
| Friday | 6 AM–4 PM |
| Saturday | Closed |
| Sunday | Closed |
Google categories: Waste management service, Recycling center
View on Google Maps →Last checked October 25, 2026.
More from Google Business Profile
Listed features
- Accessibility
- Wheelchair accessible entrance
- Wheelchair accessible parking lot
Photos on Google: 56
Recent Google reviews (excerpts)
Written by Google users, not by EdgeLocal. EdgeLocal has not verified them and does not show reviewer names.
5 out of 5 stars · Jul 2026
Best and easiest trash disposal company to work with in the Milwaukee area. Highly recommend!
5 out of 5 stars · Feb 2026
The lady who answers the phone is an absolute superstar! Dumpster arrived on the timeframe that they had given me. Seriously shout out to the scheduler and lady that answers the phone very pleasant and great customer service.
5 out of 5 stars · Oct 2025
I have had nothing but amazing experiences with Eagle! Drivers and management are super friendly and easy to work with. The dumpsters look great and don’t stand out like other companies. Their trucks also looks awesome!
The owner replied to 0 of the 5 most recent reviews Google showed.
From Google Business Profile, last checked October 25, 2026.
About concrete contractors in Franksville
Concrete contractors pour and repair driveways, patios, sidewalks, slabs and steps. Concrete contractors grade and compact base, set forms and reinforcement, pour and finish driveways, patios, garage floors and walkways, cut control joints, apply sealers and repair cracked or sunken slabs.
Typical cost: $3,500–$12,000 for a typical driveway or patio. See the full cost guide
Typical U.S. ranges from industry sources (2024–25); not EdgeLocal data. Your quote will vary with scope, materials and location.
Questions to ask this contractor
- Ask about base prep: Proper gravel base and compaction prevent settling.
- Confirm thickness and reinforcement: Get slab thickness and rebar/mesh in writing.
- Discuss control joints: Joints control where cracks occur.