Premier Electrical Corporation
electrical
Serving Brooklyn Park, MN
From Google Business Profile
3.0
14 Google reviews
Hours
| Monday | 8 AM–5 PM |
| Tuesday | 8 AM–5 PM |
| Wednesday | 8 AM–5 PM |
| Thursday | 8 AM–5 PM |
| Friday | 8 AM–5 PM |
| Saturday | Closed |
| Sunday | Closed |
Google categories: Electrician
View on Google Maps →Last checked October 14, 2026.
More from Google Business Profile
Photos on Google: 2
Recent Google reviews (excerpts)
Written by Google users, not by EdgeLocal. EdgeLocal has not verified them and does not show reviewer names.
1 out of 5 stars · Aug 2025
Based of the other reviews, the bad service seems to align with their bad drivers. Got ran off the road by one of their work vans and they refused to answer the phone even though they are obviously open. Unless they’re bad at updating…
1 out of 5 stars · Jun 2025
Teach your guys to learn how to drive. They are out here going 80mph down hwy 65. How embarrassing for your company.
1 out of 5 stars · Mar 2025
This morning there was a Premier truck (#E4001457) working on the corner of Lake and 21st in South Minneapolis. My coworker, who’s visually impaired, was having a hard time finding the crosswalk because the truck was parked on the…
The owner replied to 0 of the 5 most recent reviews Google showed.
From Google Business Profile, last checked October 14, 2026.
About electricians in Brooklyn Park
Electricians install, upgrade and repair wiring, panels, lighting and electrical safety devices. Electricians upgrade service panels, add circuits for kitchens and EV chargers, replace outdated knob-and-tube or aluminum wiring, install lighting, ceiling fans and generators, and correct code violations found in home inspections.
Typical cost: $200–$2,800 for most service calls to panel upgrades. See the full cost guide
Typical U.S. ranges from industry sources (2024–25); not EdgeLocal data. Your quote will vary with scope, materials and location.
Questions to ask this contractor
- Verify the electrical license: Ask for a state or local license and check it with the licensing board.
- Confirm the permit plan: Ask who pulls the permit and schedules the inspection.
- Get a line-item quote: Each circuit, device and fixture should be listed separately.