Valley Electric
electrical
Serving Crookston, MN
From Google Business Profile
4.0
4 Google reviews
Hours
| Monday | 8 AM–5 PM |
| Tuesday | 8 AM–5 PM |
| Wednesday | 8 AM–5 PM |
| Thursday | 8 AM–5 PM |
| Friday | 8 AM–5 PM |
| Saturday | Closed |
| Sunday | Closed |
Google categories: Electrician
View on Google Maps →Last checked October 21, 2026.
More from Google Business Profile
Photos on Google: 3
Recent Google reviews (excerpts)
Written by Google users, not by EdgeLocal. EdgeLocal has not verified them and does not show reviewer names.
1 out of 5 stars · Sep 2026
Tried to ask them to repair some minor electrical stuff and he just hung up on me.
5 out of 5 stars · Aug 2026
The crew was at the jobsite fast and was able to know the job out quickly. Very impressed and will be using them again
5 out of 5 stars · Jan 2024
We had a great experience with Valley Electric. They returned my call and answered my questions. Then we set up a time to get a bid on the work we wanted done. Since we weren't in a big hurry time wise, they fit us in and kept us updated…
The owner replied to 0 of the 4 most recent reviews Google showed.
From Google Business Profile, last checked October 21, 2026.
About electricians in Crookston
Electricians install, upgrade and repair wiring, panels, lighting and electrical safety devices. Electricians upgrade service panels, add circuits for kitchens and EV chargers, replace outdated knob-and-tube or aluminum wiring, install lighting, ceiling fans and generators, and correct code violations found in home inspections.
Typical cost: $200–$2,800 for most service calls to panel upgrades. See the full cost guide
Typical U.S. ranges from industry sources (2024–25); not EdgeLocal data. Your quote will vary with scope, materials and location.
Questions to ask this contractor
- Verify the electrical license: Ask for a state or local license and check it with the licensing board.
- Confirm the permit plan: Ask who pulls the permit and schedules the inspection.
- Get a line-item quote: Each circuit, device and fixture should be listed separately.