Hageman Homes LLC
Concrete
Serving Foley, MN
From Google Business Profile
5.0
24 Google reviews
Hours
| Monday | Open 24 hours |
| Tuesday | Open 24 hours |
| Wednesday | Open 24 hours |
| Thursday | Open 24 hours |
| Friday | Open 24 hours |
| Saturday | Open 24 hours |
| Sunday | Open 24 hours |
Google categories: Concrete contractor, Carpenter, Construction company, Excavating contractor, General contractor, Home builder, Masonry contractor
View on Google Maps →Last checked October 22, 2026.
More from Google Business Profile
Photos on Google: 164
Recent Google reviews (excerpts)
Written by Google users, not by EdgeLocal. EdgeLocal has not verified them and does not show reviewer names.
5 out of 5 stars · Aug 2026
Hageman Homes did an excellent job on my 56’ x 36’ pole shed pad. Communication was easy throughout the entire process and they were great to work with. They were timely getting the work completed and very flexible when the timeframe had…
5 out of 5 stars · Jul 2026 · Owner replied
Jacob and his team put in a concrete floor in our pole barn and finished it all in one day. They were courteous, prompt and easy to communicate with. Would recommend!
5 out of 5 stars · Jun 2026
Poured a slab in my barn. Solid crew, Jacob was true to his word. Fair price. I will use them again.
The owner replied to 3 of the 5 most recent reviews Google showed.
From Google Business Profile, last checked October 22, 2026.
About concrete contractors in Foley
Concrete contractors pour and repair driveways, patios, sidewalks, slabs and steps. Concrete contractors grade and compact base, set forms and reinforcement, pour and finish driveways, patios, garage floors and walkways, cut control joints, apply sealers and repair cracked or sunken slabs.
Typical cost: $3,500–$12,000 for a typical driveway or patio. See the full cost guide
Typical U.S. ranges from industry sources (2024–25); not EdgeLocal data. Your quote will vary with scope, materials and location.
Questions to ask this contractor
- Ask about base prep: Proper gravel base and compaction prevent settling.
- Confirm thickness and reinforcement: Get slab thickness and rebar/mesh in writing.
- Discuss control joints: Joints control where cracks occur.