Skip to main content

SKYHAWK CONSTRUCTION LLC

the free encyclopedia "Douglas A-4" redirects here. For the 1920s biplane · from USS&#160 · Oriskany · en route to attack a target in North Vietnam · 21 November 1967 General information Type Attack aircraft · fighter · 960 History Manufactured 1954–1979 Introduction date 1&#160 · October 1956 &#59 · &#32 · 69 years ago &#160 · ( 1956-10-01 ) First flight 22&#160 · June 1954 &#59 · 71 years ago &#160 · ( 1954-06-22 ) Retired USMC (1998) · subsonic · carrier-capable · straightforward · and lightweight aircraft for the era · its maximum takeoff weight of 24 · 500 pounds (11

GIG HARBOR, WA 98329

Services

the free encyclopedia "Douglas A-4" redirects here. For the 1920s biplane
from USS&#160
Oriskany
en route to attack a target in North Vietnam
21 November 1967 General information Type Attack aircraft
Learn more
fighter
960 History Manufactured 1954–1979 Introduction date 1&#160
October 1956 &#59
&#32
69 years ago &#160
( 1956-10-01 ) First flight 22&#160
June 1954 &#59
71 years ago &#160
( 1954-06-22 ) Retired USMC (1998)
subsonic
carrier-capable
straightforward
and lightweight aircraft for the era
its maximum takeoff weight of 24
500 pounds (11

Reviews

No reviews yet. Be the first to share your experience.

Request a free quote

Contractor and licensing FAQs

  • How do I verify a contractor is licensed?

    Start by asking the contractor directly for their license number and the issuing authority. Licensing is trade-specific: plumbers and HVAC mechanics are typically licensed through your state's plumbing and mechanical systems licensing board; electrical contractors are licensed through your state's electrical licensing authority; general construction contractors register with your state licensing board. You can look up license status online through your state's professional licensing bureau online or through your state's contractor registration database. Before any work begins, also ask for a current certificate of general liability insurance and workers' compensation coverage. Confirm the coverage limits are adequate for your project—at minimum $1 million in general liability. EdgeLocal profiles include ratings and direct contact info, but license verification must be confirmed directly with the contractor and the relevant state agency.

  • Should I get multiple quotes from contractors?

    Yes—always get at least two or three quotes before hiring any contractor for significant work. Multiple quotes let you compare price, scope, materials, and timeline, and help you spot outliers: a quote significantly lower than others may indicate missing scope or cut corners, while a much higher quote may not be justified. When collecting quotes, give each contractor a clear description of the project so you can make accurate comparisons. Ask each to break out labor and materials separately when possible, and confirm what's included: demolition, permits, materials, cleanup, and warranty. Ask for estimated start dates and project duration as well. Use EdgeLocal to quickly find several rated contractors in your area so you can start the quote process without extensive additional research.

Contact

Address

8120 143rd st ct nw

GIG HARBOR, WA 98329

Is this your business?

Claim your profile to update info. Add keyword rankings for $25/mo.

Claim this profile