Skip to main content

KEMAL SELIMOVIC

1923–1924 3.1.2 Civic independence and the caliphate · 1926–1930 3.1.8 Opposition to Mustafa Kemal in 1930–1931 3.1.9 Modernization efforts · 1923–1929 3.3.2 Great Depression · 1929–1931 3.3.3 Liberalization and planned growth · the free encyclopedia President of Turkey from 1923 to 1938 For other people named Mustafa Kamal · see Mustafa Kamal (disambiguation) . "Atatürk" redirects here. For other uses · its readable prose size was 15 · 600 words. Consider splitting content into sub-articles · condensing it · –&#32 · Party In office 9 September 1923&#160 · 10 November 1938 Constituency Ankara Personal details Born Ali Rıza oğlu Mustafa &#91 · a &#93 · c. &#8201 · 1881 Salonica · Ottoman Empire Died 10 November 1938 (1938-11-10) (aged&#160 · 56–57) Istanbul · Turkey Resting place Anıtkabir · Ankara &#91 · b &#93

BEAVERTON, OR 97078

Services

1923–1924 3.1.2 Civic independence and the caliphate
1926–1930 3.1.8 Opposition to Mustafa Kemal in 1930–1931 3.1.9 Modernization efforts
1923–1929 3.3.2 Great Depression
1929–1931 3.3.3 Liberalization and planned growth
the free encyclopedia President of Turkey from 1923 to 1938 For other people named Mustafa Kamal
see Mustafa Kamal (disambiguation) . "Atatürk" redirects here. For other uses
its readable prose size was 15
600 words. Consider splitting content into sub-articles
condensing it
–&#32
Party In office 9 September 1923&#160
10 November 1938 Constituency Ankara Personal details Born Ali Rıza oğlu Mustafa &#91
a &#93
c. &#8201
1881 Salonica
Ottoman Empire Died 10 November 1938 (1938-11-10) (aged&#160
56–57) Istanbul
Turkey Resting place Anıtkabir
Ankara &#91
b &#93

Reviews

No reviews yet. Be the first to share your experience.

Request a free quote

Contractor and licensing FAQs

  • How do I verify a contractor is licensed?

    Start by asking the contractor directly for their license number and the issuing authority. Licensing is trade-specific: plumbers and HVAC mechanics are typically licensed through your state's plumbing and mechanical systems licensing board; electrical contractors are licensed through your state's electrical licensing authority; general construction contractors register with your state licensing board. You can look up license status online through your state's professional licensing bureau online or through your state's contractor registration database. Before any work begins, also ask for a current certificate of general liability insurance and workers' compensation coverage. Confirm the coverage limits are adequate for your project—at minimum $1 million in general liability. EdgeLocal profiles include ratings and direct contact info, but license verification must be confirmed directly with the contractor and the relevant state agency.

  • Should I get multiple quotes from contractors?

    Yes—always get at least two or three quotes before hiring any contractor for significant work. Multiple quotes let you compare price, scope, materials, and timeline, and help you spot outliers: a quote significantly lower than others may indicate missing scope or cut corners, while a much higher quote may not be justified. When collecting quotes, give each contractor a clear description of the project so you can make accurate comparisons. Ask each to break out labor and materials separately when possible, and confirm what's included: demolition, permits, materials, cleanup, and warranty. Ask for estimated start dates and project duration as well. Use EdgeLocal to quickly find several rated contractors in your area so you can start the quote process without extensive additional research.

Contact

Address

5139 SW 195TH PL

BEAVERTON, OR 97078

Is this your business?

Claim your profile to update info. Add keyword rankings for $25/mo.

Claim this profile