Skip to main content

WATERLOO ELECTRICAL AND CONSTRUCTION LLC

/ &#xfeff · 50.6781°N 4.4122°E &#xfeff · / 50.6781 · 4.4122 From Wikipedia · the free encyclopedia 1815 battle of the Waterloo campaign For other uses · 1815 Date 18&#160 · June 1815 &#59 · &#32 · 210 years ago &#160 · ( 1815-06-18 ) Location Waterloo · United Kingdom of the Netherlands (present-day Belgium) 50°40′41″N 4°24′44″E &#xfeff · 4.4122 Result Coalition victory Belligerents &#160 · France &#160 · United Kingdom &#160 · Prussia &#160 · Netherlands Hanover Nassau &#160 · Brunswick Commanders and leaders Napoleon I Michel Ney &#91 · nb 1 &#93 · ( WIA ) Rowland Hill Thomas Picton &#160 · &#8224

Services

/ &#xfeff
50.6781°N 4.4122°E &#xfeff
/ 50.6781
4.4122 From Wikipedia
the free encyclopedia 1815 battle of the Waterloo campaign For other uses
1815 Date 18&#160
June 1815 &#59
&#32
210 years ago &#160
( 1815-06-18 ) Location Waterloo
United Kingdom of the Netherlands (present-day Belgium) 50°40′41″N 4°24′44″E &#xfeff
4.4122 Result Coalition victory Belligerents &#160
France &#160
United Kingdom &#160
Prussia &#160
Netherlands Hanover Nassau &#160
Brunswick Commanders and leaders Napoleon I Michel Ney &#91
nb 1 &#93
( WIA ) Rowland Hill Thomas Picton &#160
&#8224

Reviews

No reviews yet. Be the first to share your experience.

Request a free quote

Contractor and licensing FAQs

  • How do I verify a contractor is licensed?

    Start by asking the contractor directly for their license number and the issuing authority. Licensing is trade-specific: plumbers and HVAC mechanics are typically licensed through your state's plumbing and mechanical systems licensing board; electrical contractors are licensed through your state's electrical licensing authority; general construction contractors register with your state licensing board. You can look up license status online through your state's professional licensing bureau online or through your state's contractor registration database. Before any work begins, also ask for a current certificate of general liability insurance and workers' compensation coverage. Confirm the coverage limits are adequate for your project—at minimum $1 million in general liability. EdgeLocal profiles include ratings and direct contact info, but license verification must be confirmed directly with the contractor and the relevant state agency.

  • Should I get multiple quotes from contractors?

    Yes—always get at least two or three quotes before hiring any contractor for significant work. Multiple quotes let you compare price, scope, materials, and timeline, and help you spot outliers: a quote significantly lower than others may indicate missing scope or cut corners, while a much higher quote may not be justified. When collecting quotes, give each contractor a clear description of the project so you can make accurate comparisons. Ask each to break out labor and materials separately when possible, and confirm what's included: demolition, permits, materials, cleanup, and warranty. Ask for estimated start dates and project duration as well. Use EdgeLocal to quickly find several rated contractors in your area so you can start the quote process without extensive additional research.

Contact

Address

4.1 Preparation 4.2 Hougoumont 4.3 The Grand Battery starts its bombardment 4.4 Napoleon spots the Prussians 4.5 First French infantry attack 4.6 Charge of the British heavy cavalry 4.7 The French cavalry attack 4.8 Second French infantry attack 4.9 French capture of La Haye Sainte 4.10 Arrival of the Prussian IV Corps: Plancenoit 4.11 Zieten's flank march 4.12 Attack of the Imperial Guard 4.13 Prussian capture of Plancenoit 4.14 French disintegration 5 Aftermath 6 Analysis Toggle Analysis subse

Is this your business?

Claim your profile to update info. Add keyword rankings for $25/mo.

Claim this profile